MEETING DATE: Wednesday, July 1, 2009 |
APPLICANT(s): Dennis Slocomb Slocomb RE Holding Company, LLC |
||
|
APPLICATION STATUS: 65 days expires: |
APPLICANT’S REP: Meridian Land Services, Inc. |
REVIEWED BY: Steven Wagner NRPC Circuit Rider |
|
|
EXECUTIVE SUMMARY: The applicant(s) have submitted an application for acceptance and approval for a proposed repair facility and office consisting of a 5,700 ft² building (small office, workshop for welding and service repairs), and located on lot F-161 with access taken from NH 31 south. The parcel frontage does not meet current zoning for frontage (77 linear feet), but is an existing lot of record and is not being made less conforming. LaBombard Engineering’s comments dated June 20, 2009 review plan revision 090428. The issues have been addressed. NRPC has no issues at this time except action on waiver, acceptance and action on approval.. See issues and recommendations below.
|
|||
BACKGROUND
Tax Map /
Area / Acres, Ft.²: 5 acres
Steep Slopes: n/a
Road Access /(Closest Intersection): NH 31 (NH 31 &
Zoning District(s): Overlay Districts: Industrial
Aquifer / Wetlands / Floodplain
(FEMA Flood Hazard Zone): Yes / No
Surface Water Bodies: Gambol Brook / within 100’ of
ISSUES:
Waiver(s) Conditional Use Permit (CUP) Special Exception(s) Variance(s) Easements
Condo Documents State Permit(s) / Road
APPLICATION
ACCEPTANCE:
1. Verify owners signature and professional seals/signatures are on plan
2. Address waiver – SP 9.8, Landscape Plan
APPROVAL:
1. Received- Sheet 1 of 4 (lower left) State Subsurface and Curb cut permits are pending
2. Received – Comments addressed – Engineering review of stormwater management – drainage report
3. Waiver request received – Pending – See acceptance above – Landscaping, SP 9.8
4. Note 13 revised - Provide better description/detail for containment area
5. Decided not necessary for small project - Define Active and Substantial Development
6. Bounds exist as shown; existing lot - Confirm existing bounds are in place or replace missing bounds
7. Added - Error and omissions note?
8. Done - Label Sheet 1 of 4 “SP-1”
9. Done - Label sheet 3 of 4 “Sheet No. 3 OF 4”
10. Done 7 – 7 - Note 14 (7 am to 6 pm) or 7am to 7 pm as minutes show?
11. Done - Note 19 – Add after Prior to construction, “a Preconstruction Meeting will be held per Site Plan sec. 10.0, and”…
STAFF RECOMMENDATION:
1. Board and abutter comments on acceptance
2. Act on Waivers
3. Board and abutter comments on approval
4. Approval consideration or continue to a date certain
5.
CONDITIONS OF APPROVAL
Plan copies with professional seals & signatures
Original Mylar with professional seals & signatures
Electronic submission per regulations (As-builts as required)
Bond estimate (where applicable)
State Permits – Curb-cut, Subdivision (Sub Surface/Septic), Site Specific, Alteration of Terrain (Dredge & Fill)
All fees paid, and escrow maintained as required
Changes to Plat as detailed in minutes and this report (List)